土地整理中机井水位降深的测算(英文)
河南省科学院地理研究所 中国中铁电气化局集团第三工程有限公司
2013-06-27
土地整理 水位降深 经验公式
[目的]研究土地整理中机井水位降深的测算方法.[方法]根据抽水试验资料,作出机井水位降深和出水量的关系曲线,得到计算水位降深的经验公式,并通过实例进行说明.[结果]降深h与流量Q关系曲线的类型主要有直线型、抛物线型、指数曲线型和对数曲线型等,可用图解法和差分法来判断曲线类型;实例计算结果说明,图解法和差分法的计算结果较为接近.[结论]由抽水试验资料建立的经验公式,反映了机井水位降深和出水量之间的相关关系,是合符实际的有效方法.%[Objective] The aim was to explore the measurement methods of drawdown of motor-pumped well in land consolidation. [Method] Based on pumping information, the relation curve of drawdown and pumped volume was drawn and the empirical formula was concluded, with examples. [Result] The type of drawdown (h) and flow volume (Q) includes linear type, parabolic type, exponential curve and logarithmic curve. Graphical method and calculus of differences are available for determining the type of curve. [Conclusion] The empirical formula based on pumping test reflects relation between drawdown and pumping volume, which is simple and effective.